Rio Tinto Koodiaderi Switchrooms

April 2020 – Ongoing

Fabrication and erection of structural steel inc grating & handrails for 18 switchrooms in 18 weeks, all up there will be 160tn of steel, 41tn of purlins, 600sqm of grating and 340lm of handrailing, all fabricated, supplied and erected by Solution Steel.
  • Rio Tinto Koodiaderi Switchrooms
  • Rio Tinto Koodiaderi Switchrooms
  • Rio Tinto Koodiaderi Switchrooms

BHP Rail Crossover Modules – Area C

June 2020

Drafting, fabrication and erection of 22tn of structural steel modules inc grating, handrails and stairs pre-assembled in the clients yard for pre-wiring of services before going to site. All delivered ontime and in budget.
  • BHP Rail Crossover
  • BHP Rail Crossover
  • BHP Rail Crossover

Metro Fuel – Geraldton

May 2020

Erecting 25tn of fabricated structural steel for the Midwest newest service station, Solution Steel erected the Metro Fuel new fuel station including the refuelling canopy and sales showroom ontime and within budget.
  • Metro Fuel – Geraldton
  • Metro Fuel – Geraldton
  • Metro Fuel – Geraldton
  • Metro Fuel – Geraldton
  • Metro Fuel – Geraldton
  • Metro Fuel – Geraldton

Talison Switchroom & Lift – Greenbushes

January 2020

After fabricating and erecting onsite 13tn of structural steel, Solution Steel was asked to lift this 25tn room into place at Talison Lithium Mine – Greenbushes.

The placing with stairs and platforms erected was completed safely on the Greenbushes mine site, all in a days work…

  • Greenbushes Lift
  • Greenbushes Lift
  • Greenbushes Lift
  • Greenbushes Room
  • Greenbushes Room

Centurion Warehouse – Kalgoorlie

November & December 2019

Erecting 60tn of fabricated structural steel in the heart of the Goldfield’s, Solution Steel erected Centurion’s new warehouse and office steel, purlins and wash bay materials on time and within budget.

  • Centurion Kalgoorlie
  • Centurion Kalgoorlie
  • Centurion Kalgoorlie
  • Centurion Kalgoorlie
  • Centurion Kalgoorlie
  • Centurion Kalgoorlie

Alcoa Switchroom & Lift – Wagerup

August 2019

After fabricating and erecting onsite 20tn of structural steel, Solution Steel was asked to lift these two 30tn rooms into place at Alcoa Wagerup.

Once the first room was on its columns and bolted down, the second room was placed next to the first and skull dragged across with come alongs.

The placing and bringing the rooms together with stairs and platforms erected were completed safely on the Wagerup mine site in two days.

  • Alcoa Lift 1
  • Alcoa Lift 2
  • Alcoa Lift 3
  • Alcoa Lift 4
  • Alcoa Lift 5

Faye Gladstone Netball Stadium – South Hedland

August 2018

Fabricating and Erecting 25tn of steel for the community of Port/South Hedland. Solution Steel supplied the drafting, fabrication and erection of the structural steel and purlins for the Faye Gladstone Netball stadium in South Hedland.

  • Faye Gladstone 5
  • Faye Gladstone 1
  • Faye Gladstone 3
  • Faye Gladstone 4
  • Faye Gladstone 2

Switchrooms

April 2016 – Ongoing

Solution Steel has successfully completed over 40 structural steel switchrooms to date, ranging from 10m in length to over 40m. These rooms have been freighted all over the state for various electrical purposes.

With a focus on safety and building these rooms on time and within budget, Solution Steel is your only choice for your next steel project.

  • Switchrooms
  • Switchrooms
  • Switchrooms

Have a Project in Mind?

Get In Touch Today!